Professional Summary
Work Experience
Electrical Engineer
[Company]• Passed CISPR 11 Class B radiated emissions on the first test-lab visit — a $12K retest avoided — by fixing return paths and adding a common-mode choke identified in pre-compliance near-field scans.
• Cut BOM cost 22% ($14 per unit at 30K units/year) by consolidating five voltage rails onto two switching regulators and qualifying second sources for 40+ passives during the shortage.
• Brought a 6-layer, 900-component controller board from schematic capture to validated production in two revisions, against a product-line average of four.
• Raised flyback converter efficiency from 81% to 89% at full load, eliminating the heatsink and dropping enclosure temperature 11°C in thermal-chamber testing.
• Lifted end-of-line test coverage from 60% to 96% by writing the design-for-test guidelines and adding boundary-scan access on all new boards, catching solder defects the optical inspection missed.